Add XCom Push Support in Deferred for KPO#64069
Open
jscheffl wants to merge 2 commits intoapache:mainfrom
Open
Add XCom Push Support in Deferred for KPO#64069jscheffl wants to merge 2 commits intoapache:mainfrom
jscheffl wants to merge 2 commits intoapache:mainfrom
Conversation
3431079 to
e2516db
Compare
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
With PR #64068 assuming it is possible to make this into Airflow 3.2.0 it is possible to push XCom directly from triggerer.
Except callbacks this would resolve the need to return to a worker to complete a task directly from triggerer. This PR builds on top of #64068 and applies the feature to KPO:
Note that CI will most probably fail until PR #64068 is not merged.
Was generative AI tooling used to co-author this PR?
Claude Opus 4.6
{pr_number}.significant.rst, in airflow-core/newsfragments. You can add this file in a follow-up commit after the PR is created so you know the PR number.